Project Detail

  • Location​ : FUJAIRAH, U.A.E
  • Contractor : POWER PLANT
  • Project Description​ : (G+1) & (G+2) 7 Electrical Substations
  • Completion date​ : 04-02-2021

Detailed Modeling

At LOD 350 Using Tekla Structure, Fabrication Drawings: Full set of fabrication drawings for fully precast building

Clash Detection and Resolution

LOD 350 models are used for clash detection, helping identify and resolve conflicts between different building systems or components before construction begins. This reduces the likelihood of costly rework on-site.

error: Content is protected !!